TerraVici RSS Operates Over 9 Days In Canadian Bakken Horizontal Well

June 2013

TerraVici RSS operated for over 9 days in a Canadian Bakken well; steering and adjusting the 12,188 foot wellbore path for geologic preferences.  The RSS performed exceptionally throughout the 9 days and was pulled at well TD functioning as designed.

Comments are closed.

 
© 2016 TerraVici Drilling Solutions, Inc